PLH (the Hebrew acronym for pe'ilut lo chakla'it, non-agricultural activity; Israel Land Council decisions call it non-agricultural employment) is a non-farming business use in the residential plot of a nahala (an agricultural family holding in a moshav), limited, as a rule, to 500 built square metres in total. The use is regularised only when it is permitted in planning terms, under a valid plan or a deviating-use permit, the permits required by law have been granted, and the required transaction with the Israel Land Authority (RMI, from its Hebrew initials) has been made and paid for. This reflects the Israel Land Council decisions compendium and RMI procedures as checked in November 2026.
What is PLH and which decision governs it
The rules are in sub-chapter 8.9 of the Israel Land Council decisions compendium, on non-agricultural employment in the residential plot in a moshav. According to RMI's service page, the arrangement is based on Council Decision 1101, approved on 26 June 2007. RMI applies it through Procedure 37.04B, last published on 21 July 2024.
The procedure defines PLH as use of land within the residential plot for non-agricultural purposes, including rural holiday units (kayit kafri, known as zimmers), under a valid plan or a valid deviating-use permit. The arrangement is meant for nahala rights holders in moshavim and, under the procedure, does not apply to a kibbutz or a collective moshav (moshav shitufi).
How much area is allowed for PLH and how does it relate to the residential plot
- As a rule, the total built area for non-agricultural employment (PLH) is limited to 500 square metres, subject to the rules for calculating the quota and to exceptions concerning earlier transactions approved by RMI, even if the planning bodies approved larger building rights (section 8.9.2(3)).
- The building stands only in the residential plot (chelkat hamegurim): a contiguous area of up to 2.5 dunams (2,500 square metres) within plot A of the nahala, zoned for housing and containing the dwellings. There are narrow exceptions, for example a residential plot of up to 1.5 dunams in which, under a planning opinion, the building cannot be placed.
- The quota also includes PLH uses lawfully approved outside the residential plot before the cut-off date in 2007.
- Uses ancillary to farming under sub-chapter 8.10, such as a winery, an olive press or a cheese dairy, are deducted from the quota in part: 30% of their area, and the whole area of a farm shop. Buildings for housing and treating animals and tourism-educational activity are not deducted.
PLH rights always remain an inseparable part of the nahala and cannot be transferred apart from it. They are also separate from residential rights: a holder who bought all residential rights in the residential plot still pays separately for realising PLH (section 8.3.49(e)).
Which uses are allowed and which are not
The compendium defines non-agricultural employment as any activity that is not agricultural, carried out under a plan or a valid deviating-use permit. The list of uses actually allowed is therefore set in the plan that applies to the moshav, and differs from one settlement to another. RMI classifies PLH transactions under these purposes: commerce, holiday accommodation, industry and crafts, offices, storage and photovoltaic installations.
The limits on RMI's side are these:
- Self-operation. The rights holder undertakes to operate the use personally, with no partnership and no letting. Operation by a relative who lives permanently on the nahala is not treated as letting.
- Letting is allowed only for a list of uses linked to farming and the rural fabric, set by RMI's management. The list includes, among others, storage and sale of farm produce, a plant nursery, a winery, a dairy, a brewery, a veterinarian and a garage for farm machinery.
- Where the basis is a deviating-use permit, the use is allowed only in an existing building or a movable structure. Erecting a new building that is not movable is not allowed.
- PLH use outside the residential plot is not approved, apart from the exceptions specified.
What planning permit is needed
There are two routes. The first is a valid plan (taba, a statutory zoning plan) that allows the use, and under it a building permit under section 145 of the Planning and Building Law. A plan can permit a use, but does not in itself replace a building permit required for a building or for works. The second is a deviating-use permit (heter leshimush choreg) granted by the local committee under section 146 of the Law. A permit for a use deviating from a plan is given for a period limited in advance (section 148), and after a notice is published and objections can be filed (section 149).
What is paid to the Israel Land Authority
| Route | Payment to RMI | Period |
|---|---|---|
| Under a valid plan | Capitalised lease fees at 91% of the land value, with a possible offset of a betterment levy paid for the requested use, subject to conditions and a payment floor of 46% | A 49-year lease |
| Under a deviating-use permit | Usage fees at 5% of the land value for each permit year, in advance for the whole period, and a bank guarantee of 10% of the land value | The permit period, and no more than five years |
Regional discounts do not apply to these payments, except for rural holiday units. The land value is set by an individual appraisal or by representative values for the settlement, according to the designation and the extent of the use. A condition of the transaction is regularising all unregularised uses on the nahala and paying debts to RMI. For past use without a transaction, usage fees are charged under Procedure 90.07B: for the actual period of use, up to seven years back, at 5% a year in an agreed regularisation.
What is the difference between PLH potential in a listing and an approved, paid-for PLH
A regularised PLH use rests on four layers, each checked separately:
- The plan that applies to the nahala allows the specific use, or a valid deviating-use permit allowing it has been granted.
- A building permit has been granted, or a deviating-use permit that is still valid.
- A transaction was made with RMI, the payment was made and a PLH lease or licence agreement was signed.
- The use is operated under the terms of the transaction, including the self-operation duty.
RMI recognises both routes, so conformity with a plan should not be required in every case of a lawfully approved deviating use.
PLH potential in a listing may describe only the first layer, and sometimes only the existence of a building that could be converted. A building used for PLH without an RMI transaction is an unregularised use. Under Procedure 37.02B, RMI approves a transfer of rights in a nahala only after all unregularised uses have been regularised. Where separate PLH leases were signed, the rights under them are transferred together with the nahala.
Procedure 37.04B adds a caveat: RMI's approval of a transaction is not confirmation that the buildings were built with a permit, and responsibility for the existence of a building permit lies with the rights holder.




